Phuntsholing-Chamkuna road,PCR (3.359 Km)

Phuntsholing–Chamkuna Road, PCR (3.359 Km) (2022-2023)

The Phuntsholing–Chamkuna Road (PCR) project covers a stretch of 3.359 kilometers, designed to strengthen connectivity, improve trade logistics, and enhance mobility in the southern region. This road section plays a vital role in linking border communities with Phuntsholing, Bhutan’s primary commercial hub.

Scope of Work:

  1. Road Formation & Earthwork – Cutting, filling, and grading to establish the required road profile.

  2. Pavement Construction – Laying granular sub-base, base course, and bituminous surfacing for durability and smooth travel.

  3. Drainage Works – Building side drains, cross-drainage structures, and culverts to manage stormwater.

  4. Slope Protection – Construction of retaining and breast walls, gabions, and erosion control measures.

  5. Road Safety Measures – Installation of signage, markings, and safety barriers.

Objectives:

  • Strengthen connectivity between Phuntsholing and Chamkuna.

  • Facilitate efficient transport of goods and services across the corridor.

  • Support regional trade and cross-border linkages.

  • Improve access to socio-economic opportunities for local communities.

The 3.359 km PCR stretch is a strategic infrastructure investment, contributing directly to Bhutan’s goals of regional integration, economic growth, and sustainable transport development.