Construciton of access road and Bridges for Dorjilung Hydropower Project
Project Description:(ongoing)
Construction of access roads and bridges for the Dorjilung Hydropower Project, under Contract Package – Infra 1 (Lot 3 & Lot 4). The project aims to provide reliable transportation infrastructure to support hydropower construction activities while ensuring compliance with engineering, safety, and environmental standards.
Scope of Work:
-
Construction of access roads, including earthworks, embankments, sub-base, and pavement layers.
-
Design and construction of bridges to facilitate safe crossing over rivers and streams along the access routes.
-
Installation of drainage systems to prevent waterlogging and erosion along roads and bridges.
-
Coordination with hydropower project teams to ensure timely availability of transport routes for construction materials and equipment.
-
Implementation of quality control, safety, and environmental management practices throughout the construction process.
-
Supervision and inspection by designated project engineers to ensure adherence to design specifications, durability, and structural integrity.
This infrastructure development will enable efficient access to the hydropower project site and support the timely and safe execution of associated construction works.

