(GCP-2) for the construction of 54MW Gamri -I and bumukparongchuu hydro power project

Project Description:(ongoing)
GCP-2 is engaged in the construction activities for the 54 MW Gamri-I and Bumukparongchuu Hydropower Project. The scope encompasses civil, structural, and related works necessary for the successful implementation of the hydroelectric project, ensuring compliance with design, safety, and environmental standards.

Scope of Work:

  • Construction of intake structures, headworks, and diversion channels.

  • Excavation, concreting, and structural works for tunnels, penstocks, and powerhouse foundations.

  • Installation of reinforced concrete (RCC) works for spillways, retaining walls, and other civil structures.

  • Site preparation, material handling, and temporary facilities setup for construction operations.

  • Adherence to environmental, safety, and quality control protocols throughout the project lifecycle.

  • Coordination with project engineers and supervisory authorities to ensure timely and efficient execution.

The works are executed under the supervision of designated project officers to ensure structural integrity, operational efficiency, and compliance with contractual obligations.